Mineral resources (鉱物資源)
Increasing of ferrochrome production up to 1,2 million tons, as well as 700 thousand tons of concentrate fines, 700 thousand tons of pellet, 150 thousand tons of bales, 150 thousand tons of chromic bales and 80 thousand tons of manganic bales, 200 thousand tons of high-carbon ferrochrome per year.
Place: Aktobe region
Value: USD 285 million
Term: 2008-2011. It’s necessary to develop technical and economic assessment (TEA)
Production of lead-zinc concentrates in the purpose of receiving of less-common metals from “Shalkiya” field.
Place: Qyzylorda region
Capacity: 3 million tons.
Value: USD 500 million
Term: TBC (Works on TEA were finished).
Production of soda ash.
Place: Qyzylorda region
Capacity: 400 thousand tons.
Value: USD 275 million
Term: TBC (Works on TEA were finished).
Production of metal rhenium and isotope of osmium-187.
Place: Almaty city
Capacity: 3-4 tons of rhenium and 2 kilos of isotope of osmium
Value: USD: 35 million
Term: TBC (Works on TEA were finished).
Production of over capacious tantalum powder.
Place: East-Kazakhstan region, Ust-Kamenogorsk city
Value: USD 38 million
Term: TBC (Under way).
Production of alloy steel and rolling ferromolybdenum.
Place: Akmola region, Stepnogorsk city
Capacity: 6 thousand tons.
Value: USD 46 million
Term: TBC (Works on TEA were finished).
Production of ferroalloy
Place: Aktobe region
Capacity: 200 thousand tons.
Value: USD 200-220 million
Term: Launch of first furnace will be held in 3 quarter of 2007 (Works on TEA and designation of project operator were finished. Works on DE are under way).
Production of high-rank steel of ferrosilicoaluminium.
Place: Karaganda region
Capacity: 500 thousand tons.
Value: USD 250 million
Term: TBC (Works on TEA were finished).
Construction of brass works and electrolysis plants.
Place: East-Kazakhstan region
Capacity: 80 thousand tons cathode copper per year.
Value: USD 270 million
Term: TBC (Works on TEA were finished, under construction)
Repetition work of diesel engine (D-350).
Place: Kostanay region
Description: Plant development of modern diesel engine in accordance with Euro-3 standards.
Value: USD 300 million
Term: TBC (It’s necessary to develop TEA)
Production of ferromanganese – creation of plant.
Place: Zhambyl region
Capacity: 250 thousand tons.
Value: USD 350 million
Term: TBC (It’s necessary to develop TEA)
Production of iron nickel.
Place: Kostanay region, Zhitikara district
Capacity: 140 thousand tons, as well as production of high-rank steel.
Value: USD 600 million
Term: TBC (Preliminary marketing researches are under way)
Production of steel products on electrometallurgy plants of Taraz city, Aktobe city and Temirtau city.
Place: Taraz city, Aktobe city, Temirtau city
Capacity: 350 thousand tons for each.
Value: USD 1 000 million
Term: TBC (It’s necessary to develop TEA for Aktobe city and Temirtau city. Works on TEA for Taraz city were finished)
Construction of plant on assemblage of locomotives in Astana City.
Place: Astana City
Value: USD 63,5 million
Term: 2007-2013 (Under way)
Production of solid-rolled wheels and axles.
Place: Pavlodar region
Capacity: 200 thousand of wheels and axles.
Value: USD 364 million
Term: 2008-2010 (It’s necessary to develop TEA)
Construction of plant on production of railway wheels and axles, tube storage.
Place: Pavlodar region
Capacity: 50 thousand of railway pair wheels, 40 thousand of wagon axles and 233 thousand of tube storage per year.
Value: USD 304 million
Term: 2008-2010 (It’s necessary to develop DE)
Production of longitudinal steel tubes (with anticorrosive insulation).
Place: Karaganda region
Capacity: 200-250 thousand tons.
Value: USD 148 million
Term: TBC (It’s necessary to develop TEA)
Construction of new plant on production of tires («А» class) in South-Kazakhstan region.
Capacity: 3-4 million items per year.
Value: USD 256 million
Term: TBC (It’s necessary to develop TEA)
Construction of business-industrial base (park) in Almaty City
Value: USD 500 million
Term: 3 yearsTBC (It’s necessary to develop TEA)
Construction of Bozshakolsk Mining and Processing Integrated Works plant (GOK).
Place: Pavlodar Region
Capacity 12-20 million tons of copper ore per year.
Value: USD 800 million
Term: TBC (Preliminary marketing researches, preparation of DE are under way. Works on master plan were finished)
Construction of Aktogay Mining and Processing Integrated Works plant (GOK).
Place: East Kazakhstan region
Capacity: 50-65 million tons of copper ore per year.
Value: USD 1 500 million
Term: TBC (Preliminary marketing researches, preparations of TEA are under way. Works on master plan were finished)
Production of direct rehabilitation of iron on SSGPO.
Place: Kostanay region
Capacity: 2,4 million tons of metallize products per year.
Value: USD 470 million
Term: 2008-2010 (Preliminary marketing researches will be started in 2008, production in 2009).
Construction of complex on production of metal products on the base of Irisuysk cupper-black field.
Place: Aktobe region
Value: USD 500 million
Term: 7 years (It’s necessary to develop TEA)
Construction of metallurgy plant on Sokolov-Sarbai Mining Production Association (SSGPO).
Place: Kostanay region
Capacity: production of 2,16 million tons of sheet and bar products per year.
Value: USD 350 million
Term: 2011 (Preliminary marketing researches will be started in 2010)
Creation of Pavlodar electrolysis plant on production of primary aluminium.
Place: Pavlodar region
Capacity: 250 thousand tons of primary aluminium per year.
Value: USD 864,5 million
Term: 2004-2009 (The first part of project will be put into operation in November 2007)
Production of technical silicon, crystal storage, fiber optic cable’s products.
Place: South-Kazakhstan region
Capacity: 10 thousand tons of finished commodity per year.
Value: USD 115 million
Term: Preliminary marketing researches and developing of master plan are under way
Creation of pivotal metallurgy cluster: construction of plant on the base of lead-silver field «Alygir» in Каraganda region.
Capacity: production of 1,2 million lead storage batteries in 2008, and 3 million items in 2010.
Value: USD 100 million
Term: 2008-2010 (Preliminary marketing researches and developing of master plan are under way)
End-to-end solutions on planning, production, repair and maintenance of sea oil-gas equipment
Place: Mangistau region, Kuryk village
Value: USD 130 million
Term: 2007-2009 (It’s necessary to develop TEA)
Production of polycrystalline silicon.
Place: Zhambyl region
Capacity: 2500 tons per year.
Value: USD 576 million
Term: TBC (It’s necessary to develop TEA)
Construction of Pavlodar tube-rolling mill.
Place: Pavlodar region
Capacity: 250 thousand tons of tubes, 700 thousand tons of steel reinforcement, 50 thousand tons of steel reinforce balls per year.
Value: USD 800 million
Term: The first part of project will be put into operation in November 2007
Production of chlorine alkaline on the base of Pavlodar chemical plant.
Place: Pavlodar region
Capacity: 30 thousand tons of caustic soda, 16,7 thousand tons of chlorine (liquid), 24,9 thousand tons hydrochloric acid per year.
Value: USD 108,3 million
Term: 2007-2009 (under way)
Production of facing materials and deep processing of agglomerated stones in the industrial base (park) of Astana City.
Value: USD 105 million
Term: TBC (It’s necessary to develop TEA)
Construction of the plant on production of flat glass by float-method.
Place: Qyzylorda region
Capacity: 180 thousand tons of flat glass “М1” from 3 to 11 mm. thick.
Value: USD 244,5 million
Term: 2007- 2009
Term: DE, preparatory works, building and assembly jobs were finished. Production started from August 2007
Field development of bauxite and further construction of alumina plant.
Place: Pavlodar region
Value: USD 500 million
Term: 2008-2010 (It’s necessary to develop TEA)
Mining and metallurgy production on the base of multimetal fields (deposits) of Zhayremsk Mining and Processing Integrated Works plant (GOK).
Place: Karaganda region
Capacity: 100 thousand tons of metal zinc per year.
Value: USD 928 million
Term: The implementation of the project may be started within a month after receiving a right on usage of the bowels of “Vostocniy” part of Zhayrem field (It’s necessary to develop TEA)
Construction of ammonia-carbamide complex (production of nitrogen chemical fertilizers and ammonia for production of nitrogenous phosphatic fertilizer).
Place: Mangistau region, Aktau city
Capacity: 680 tons of ammonia and 850 thousand tons of carbamide.
Value: USD 1 000 million
Term: TBC (It’s necessary to develop TEA)
Construction of industrial base (park) in Almaty City
Value: USD 700 million
Term: 4 years (It’s necessary to develop TEA)
Gasification of Nizhe-Iliysk (Lower Iliysk) deposit.
Place: Almaty region
Capacity: substitute of 7 billions cubic metres of natural gas per year
Value: USD 250-300 million
Term: TBC (It’s necessary to develop TEA)
Construction of “Moynak” hydroelectric power station.
Place: Almaty region
Capacity: 300 Mega Watt.
Value: USD 250 million
Term: 3-4 years (It’s necessary to develop TEA)
Construction of “Kerbulak” hydroelectric power station.
Place: Almaty region
Capacity: 50 Mega Watt and increasing of Kapshgai hydroelectric power station's capacity
Value: USD 81 million
Term: 3-4 years (It’s necessary to develop TEA)
Creation of integrated petrochemical complex in Atyrau region.
Place: Atyrau region
Capacity: 800 thousand tons of polyethylene and 400 thousand tons of polypropylene per year.
Value: USD 4 600 million
Term: 2007-2012 (It’s necessary to develop TEA)
Construction of Balhash heat-power station.
Place: Almaty region, Ulken village
Capacity: 1200-1300 Mega Watt to 2015
Value: USD 1500 million
Term: The first part of project will be put into operation in 2015 (It’s necessary to develop TEA)
Construction of 3 and 4 blocks of Ekibastuz hydroelectric (power) plant - 2.
Place: Pavlodar region
Capacity: 1000 Mega Watt
Value: USD 850-950 million
Term: 2008-2015 (It’s necessary to develop TEA)
Construction of gas-turbine power station and distributing networks, air and cable buses in Almaty City.
Place: Almaty City
Capacity: 180 Mega Watt and heat capacity 300 Mega Watt.
Value: USD 335 million
Term: 2008-2011 (It’s necessary to develop TEA)
Construction of heat-electric generating stations - 3 in Astana City.
Place: Astana City
Capacity: 240 Mega Watt.
Value: USD 400-450 million
Term: 2007-2012 (It’s necessary to develop TEA)
Petrochemical project along with «Hemianlagenbau Chemnitz GmbX» company (Germany) on production of natural gas and passing oil gas processing products.
Place: Mangistau region
Capacity: processing of 1 billion cubic metre of gas
Value: USD 96 million
Term: TBC (Works on DE are under way)
Construction of second transmission line (500 kilowatt): “North-South Kazakhstan” with increasing of throughput capacity more than 700 Mega Watt (spread of network 1115 km).
Place: Kostanay and Aktobe regions
Value: USD 349,6 million
Term: 2005-2009 (Under way)
Modernization of national electric networks (1 stage).
Place: All parts of Kazakhstan
Value: USD 350,4 million
Term: 2000-2009 (Under way)
Construction of inter-regional transmission line “North Kazakhstan – Aktobe region”, with throughput capacity up to 450 Mega Watt.
Place: North-Kazakhstan and Aktobe regions
Value: USD 151,2 million
Term: 2005-2008 (Under way)
Construction of gas-main: “Beyneu-Bozoy-Skalkar-Akbulak with the purpose of supply of gas from western regions to east board.
Place: Qyzylorda, Aktobe, South Kazakhstan, Mangistau, Zhambyl and Almaty regions
Value: USD 2,8/3,4/7,5 billion
Term: 2007-2009 (It’s necessary to develop TEA)
Creation of full complex on production of aromatics (production of benzol and и paraksoilol.
Place: Atyrau region
Value: USD 346 million
Term: 2007-2009 (Works on TEA were finished. Development survey works (DSW) are in final stage)
Creation of full complex on production of ethyl benzol.
Place: Atyrau region
Value: USD 116 million
Term: 2005-2009 (Works on TEA were finished).
In-situ gasification of the Nizhne-Iliisky brown coal deposit to provide South Kazakhstan with a substitute of natural gas produced from coal
Place: Almaty
Description: Receiving a substitute of natural gas by processing of coal into gas
Value: 56000000
Participation: Business plan available
Setting up a specialised enterprise for repair and production of units and equipment for gas compressor stations on the basis of West Kazakhstan Engineering Company (ZKMK)
Place: Uralsk, ZKMK, West Kazakhstan region
Description: Organising repair and production of units and equipment for gas compressor stations
Value: 3500000
Participation: Loan for 5 years, мах 8%. Business plan available
Term: 24 months
Management of manufacture for scrubbing of internal and outside surfaces of railway tanks from the rests of petroleum and oil products
Place: Qyzylorda region
Description: Construction of washing and steaming station (WSS), utilization of oil products oil sludge waste, carrying out of small current repair
Value: 9477000
Participation: Any type of financing
Term: 5 years (Development stage)
Construction of a mini refinery
Place: Karaganda region
Description: Replenishing circulating and capital assets
Value: 650000
Participation: Individual investor share, loan funds
Term: 3 years (Development stage)
Organising the production of steel oil pipes
Place: Karaganda region
Description: Organising the production of oil pipes (100-426 mm in diameter) to the API-5L standard for supplying domestic manufacturers
Value: 40000000
Participation: loan funds, individual investor share
Term: Investment pay-back period 54 months (Development stage)
The development of steeply dipping deposits in Kazakhstan using underground gasification based on mobile power units
Place: Coal mines between Zhambyl and Almaty regions
Description: The project will solve the problem of underground gasification, minimising underground preparation and operating costs
Value: 12500000
Participation: Equity till 70% if investing 100% of required sum
Term: Investment pay-back period 6 months (Project information is completed and sent to interested companies)
Production of heat insulation materials from basalt and mineral super thin fibre (BSTF and MSTF)
Place: Uralsk, West Kazakhstan region
Description: Replenishing capital and circulating assets
Value: 1000000
Participation: loan funds
Term: no information (Development stage)
Production of steel stop valves
Place: Uralsk, West Kazakhstan region
Description: organising production of steel stop valves for the oil and gas industry and other uses.
Value: 1500000
Participation: loan funds 1 000 000, own capital 600 000
Term: 10 months (Development stage)
Construction of gas-turbine units at the Uralsk Thermal Power Plant
Place: West Kazakhstan region
Description: Replenishing circulating and fixed assets
Value: 13850000
Participation: loan funds
Term: Investment pay-back period 36 months (Project information is completed and sent to interested companies)
Production and sale of rubber and general mechanical rubber goods
Place: Kostanai region
Description: Replenishing capital and circulating assets
Value: 99000
Participation: any forms of financing are acceptable
Term: no information (Development stage)
|