 Mineral resources (鉱物資源)

Increasing of ferrochrome production up to 1,2 million tons, as well as 700 thousand tons of concentrate fines, 700 thousand tons of pellet, 150 thousand tons of bales, 150 thousand tons of chromic bales and 80 thousand tons of manganic bales, 200 thousand tons of high-carbon ferrochrome per year.

Place: Aktobe region

Value: USD 285 million

Term: 2008-2011. It’s necessary to develop technical and economic assessment (TEA)

 

 

Production of lead-zinc concentrates in the purpose of receiving of less-common metals from “Shalkiya” field.

Place: Qyzylorda region

Capacity: 3 million tons.

Value: USD 500 million

Term: TBC (Works on TEA were finished).

 

Production of soda ash.

Place: Qyzylorda region

Capacity: 400 thousand tons.

Value: USD 275 million

Term: TBC (Works on TEA were finished).

 

Production of metal rhenium and isotope of osmium-187.

Place: Almaty city

Capacity: 3-4 tons of rhenium and 2 kilos of isotope of osmium

Value: USD: 35 million

Term: TBC (Works on TEA were finished).

 

Production of over capacious tantalum powder.

Place: East-Kazakhstan region, Ust-Kamenogorsk city

Value: USD 38 million

Term: TBC (Under way).

 

Production of alloy steel and rolling ferromolybdenum.

Place: Akmola region, Stepnogorsk city

Capacity: 6 thousand tons.

Value: USD 46 million

Term: TBC (Works on TEA were finished).

 

Production of ferroalloy

Place: Aktobe region

Capacity: 200 thousand tons.

Value: USD 200-220 million

Term: Launch of first furnace will be held in 3 quarter of 2007 (Works on TEA and designation of project operator were finished. Works on DE are under way).

 

Production of high-rank steel of ferrosilicoaluminium.

Place: Karaganda region

Capacity: 500 thousand tons.

Value: USD 250 million

Term: TBC (Works on TEA were finished).

 

Construction of brass works and electrolysis plants.

Place: East-Kazakhstan region

Capacity: 80 thousand tons cathode copper per year.

Value: USD 270 million

Term: TBC (Works on TEA were finished, under construction)

 

Repetition work of diesel engine (D-350).

Place: Kostanay region

Description: Plant development of modern diesel engine in accordance with Euro-3 standards.

Value: USD 300 million

Term: TBC (It’s necessary to develop TEA)

 

Production of ferromanganese – creation of plant.

Place: Zhambyl region

Capacity: 250 thousand tons.

Value: USD 350 million

Term: TBC (It’s necessary to develop TEA)

 

Production of iron nickel.

Place: Kostanay region, Zhitikara district

Capacity: 140 thousand tons, as well as production of high-rank steel.

Value: USD 600 million

Term: TBC (Preliminary marketing researches are under way)

 

Production of steel products on electrometallurgy plants of Taraz city, Aktobe city and Temirtau city.

Place: Taraz city, Aktobe city, Temirtau city

Capacity: 350 thousand tons for each.

Value: USD 1 000 million

Term: TBC (It’s necessary to develop TEA for Aktobe city and Temirtau city. Works on TEA for Taraz city were finished)

 

Construction of plant on assemblage of locomotives in Astana City.

Place: Astana City

Value: USD 63,5 million

Term: 2007-2013 (Under way)

 

Production of solid-rolled wheels and axles.

Place: Pavlodar region

Capacity: 200 thousand of wheels and axles.

Value: USD 364 million

Term: 2008-2010  (It’s necessary to develop TEA)

 

Construction of plant on production of railway wheels and axles, tube storage.

Place: Pavlodar region

Capacity: 50 thousand of railway pair wheels, 40 thousand of wagon axles and 233 thousand of tube storage per year.

Value: USD 304 million

Term: 2008-2010 (It’s necessary to develop DE)

 

Production of longitudinal steel tubes (with anticorrosive insulation).

Place: Karaganda region

Capacity: 200-250 thousand tons.

Value: USD 148 million

Term: TBC (It’s necessary to develop TEA)

 

Construction of new plant on production of tires («А» class) in South-Kazakhstan region.

Capacity: 3-4 million items per year.

Value: USD 256 million

Term: TBC (It’s necessary to develop TEA)

 

Construction of business-industrial base (park) in Almaty City

Value: USD 500 million

Term: 3 yearsTBC (It’s necessary to develop TEA)

 

Construction of Bozshakolsk Mining and Processing Integrated Works plant (GOK).

Place: Pavlodar Region

Capacity 12-20 million tons of copper ore per year.

Value: USD 800 million

Term: TBC (Preliminary marketing researches, preparation of DE are under way. Works on master plan were finished)

 

Construction of Aktogay Mining and Processing Integrated Works plant (GOK).

Place: East Kazakhstan region

Capacity: 50-65 million tons of copper ore per year.

Value: USD 1 500 million

Term: TBC (Preliminary marketing researches, preparations of TEA are under way. Works on master plan were finished)

 

Production of direct rehabilitation of iron on SSGPO.

Place: Kostanay region

Capacity: 2,4 million tons of metallize products per year.

Value: USD 470 million

Term: 2008-2010 (Preliminary marketing researches will be started in 2008, production in 2009).

 

Construction of complex on production of metal products on the base of Irisuysk cupper-black field.

Place: Aktobe region

Value: USD 500 million

Term: 7 years (It’s necessary to develop TEA)

 

Construction of metallurgy plant on Sokolov-Sarbai Mining Production Association (SSGPO).

Place: Kostanay region

Capacity: production of 2,16 million tons of sheet and bar products per year.

Value: USD 350 million

Term: 2011 (Preliminary marketing researches will be  started in 2010)

 

Creation of Pavlodar electrolysis plant on production of primary aluminium.

Place: Pavlodar region

Capacity: 250 thousand tons of primary aluminium per year.

Value: USD 864,5 million

Term: 2004-2009 (The first part of project will be put into operation in November 2007)

 

Production of technical silicon, crystal storage, fiber optic cable’s products.

Place: South-Kazakhstan region

Capacity: 10 thousand tons of finished commodity per year.

Value: USD 115 million

Term: Preliminary marketing researches and developing of master plan are under way

 

Creation of pivotal metallurgy cluster: construction of plant on the base of lead-silver field «Alygir» in Каraganda region.

Capacity: production of 1,2 million lead storage batteries in 2008, and 3 million items in 2010.

Value: USD 100 million

Term: 2008-2010 (Preliminary marketing researches and developing of master plan are under way)

 

End-to-end solutions on  planning, production, repair and maintenance of  sea oil-gas equipment

Place: Mangistau region, Kuryk village

Value: USD 130 million

Term: 2007-2009 (It’s necessary to develop TEA)

 

Production of polycrystalline silicon.

Place: Zhambyl region

Capacity: 2500 tons per year.

Value: USD 576 million

Term: TBC (It’s necessary to develop TEA)

 

Construction of Pavlodar tube-rolling mill.

Place: Pavlodar region

Capacity: 250 thousand tons of tubes, 700 thousand tons of steel reinforcement, 50 thousand tons of steel reinforce balls per year.

Value: USD 800 million

Term: The first part of project will be put into operation in November 2007  

 

Production of chlorine alkaline on the base of Pavlodar chemical plant.

Place: Pavlodar region

Capacity: 30 thousand tons of caustic soda, 16,7 thousand tons of chlorine (liquid), 24,9 thousand tons hydrochloric acid per year.

Value: USD 108,3 million

Term: 2007-2009 (under way)

 

Production of facing materials and deep processing of agglomerated stones in the industrial base (park) of Astana City.

Value: USD 105 million

Term: TBC (It’s necessary to develop TEA)

 

Construction of the plant on production of flat glass by float-method.

Place: Qyzylorda region

Capacity: 180 thousand tons of flat glass “М1” from 3 to 11 mm. thick.

Value: USD 244,5 million

Term: 2007- 2009

Term: DE, preparatory works, building and assembly jobs were finished. Production started from August 2007

 

Field development of bauxite and further construction of alumina plant.

Place: Pavlodar region

Value: USD 500 million

Term: 2008-2010 (It’s necessary to develop TEA)

 

Mining and metallurgy production on the base of multimetal fields (deposits) of Zhayremsk Mining and Processing Integrated Works plant  (GOK).

Place: Karaganda region

Capacity: 100 thousand tons of metal zinc per year.

Value: USD 928 million

Term: The implementation of the project may be started within a month after receiving  a right on usage of the bowels of “Vostocniy” part of Zhayrem field (It’s necessary to develop TEA)

 

Construction of ammonia-carbamide complex (production of  nitrogen chemical fertilizers and ammonia for production of nitrogenous phosphatic fertilizer).

Place: Mangistau region, Aktau city

Capacity: 680 tons of ammonia and 850 thousand tons of carbamide.

Value: USD 1 000 million

Term: TBC (It’s necessary to develop TEA)

 

Construction of industrial base (park) in Almaty City

Value: USD 700 million

Term: 4 years (It’s necessary to develop TEA)

 

Gasification of Nizhe-Iliysk (Lower Iliysk) deposit.

Place: Almaty region

Capacity: substitute of 7 billions cubic metres of natural gas per year

Value: USD 250-300 million

Term: TBC (It’s necessary to develop TEA)

 

Construction of “Moynak” hydroelectric power station.

Place: Almaty region

Capacity: 300 Mega Watt.

Value: USD 250 million

Term: 3-4 years (It’s necessary to develop TEA)

 

Construction of “Kerbulak” hydroelectric power station.

Place: Almaty region

Capacity: 50 Mega Watt and increasing of Kapshgai hydroelectric power station's capacity

Value: USD 81 million

Term: 3-4 years (It’s necessary to develop TEA)

 

Creation of integrated petrochemical complex in Atyrau region.

Place: Atyrau region

Capacity: 800 thousand tons of polyethylene and 400 thousand tons of polypropylene per year.

Value: USD 4 600 million

Term: 2007-2012 (It’s necessary to develop TEA)

 

Construction of Balhash heat-power station.

Place: Almaty region, Ulken village

Capacity: 1200-1300 Mega Watt to 2015

Value: USD 1500 million

Term: The first part of project will be put into operation in 2015 (It’s necessary to develop TEA)

 

Construction of 3 and 4 blocks of Ekibastuz hydroelectric (power) plant - 2.

Place: Pavlodar region

Capacity: 1000 Mega Watt

Value: USD 850-950 million

Term: 2008-2015 (It’s necessary to develop TEA)

 

Construction of gas-turbine power station and distributing networks, air and cable buses in Almaty City.

Place: Almaty City

Capacity: 180 Mega Watt and heat capacity 300 Mega Watt.

Value: USD 335 million

Term: 2008-2011 (It’s necessary to develop TEA)

 

Construction of heat-electric generating stations - 3 in Astana City.

Place: Astana City

Capacity: 240 Mega Watt.

Value: USD 400-450 million

Term: 2007-2012 (It’s necessary to develop TEA)

 

Petrochemical project along with «Hemianlagenbau Chemnitz GmbX» company (Germany) on production of natural gas and passing oil gas processing products.

Place: Mangistau region

Capacity: processing  of 1 billion cubic metre of gas

Value: USD 96 million

Term: TBC (Works on DE are under way)

 

Construction of second transmission line (500 kilowatt): “North-South Kazakhstan” with increasing of throughput capacity more than 700 Mega Watt (spread of network 1115 km).

Place: Kostanay and Aktobe regions

Value: USD 349,6 million

Term: 2005-2009 (Under way)

 

Modernization of national electric networks (1 stage).

Place: All parts of Kazakhstan

Value: USD 350,4 million

Term: 2000-2009 (Under way)

 

Construction of inter-regional transmission line “North Kazakhstan – Aktobe region”, with throughput capacity up to 450 Mega Watt.

Place: North-Kazakhstan and Aktobe regions

Value: USD 151,2 million

Term: 2005-2008 (Under way)

 

Construction of gas-main: “Beyneu-Bozoy-Skalkar-Akbulak with the purpose of supply of gas from western regions to east board.

Place: Qyzylorda, Aktobe, South Kazakhstan, Mangistau, Zhambyl and Almaty regions

Value: USD 2,8/3,4/7,5 billion

Term: 2007-2009 (It’s necessary to develop TEA)

 

Creation of full complex on production of aromatics (production of benzol and и paraksoilol.

Place: Atyrau region

Value: USD 346 million

Term: 2007-2009 (Works on TEA were finished. Development survey works (DSW) are in final stage)

 

Creation of full complex on production of ethyl benzol.

Place: Atyrau region

Value: USD 116 million

Term: 2005-2009 (Works on TEA were finished).

 

In-situ gasification of the Nizhne-Iliisky brown coal deposit to provide South Kazakhstan with a substitute of natural gas produced from coal

Place: Almaty

Description: Receiving a substitute of natural gas by processing of coal into gas

Value: 56000000

Participation: Business plan available

 

 

Setting up a specialised enterprise for repair and production of units and equipment for gas compressor stations on the basis of West Kazakhstan Engineering Company (ZKMK)

Place: Uralsk, ZKMK, West Kazakhstan region

Description: Organising repair and production of units and equipment for gas compressor stations

Value: 3500000

Participation: Loan for 5 years, мах 8%. Business plan available

Term: 24 months

 

Management of manufacture for scrubbing of internal and outside surfaces of railway tanks from the rests of petroleum and oil products

Place: Qyzylorda region

Description: Construction of washing and steaming station (WSS), utilization of oil products oil sludge waste, carrying out of small current repair

Value: 9477000

Participation: Any type of financing

Term: 5 years (Development stage)

 

Construction of a mini refinery

Place: Karaganda region

Description: Replenishing circulating and capital assets

Value: 650000

Participation: Individual investor share, loan funds

Term: 3 years (Development stage)

 

Organising the production of steel oil pipes

Place: Karaganda region

Description: Organising the production of oil pipes (100-426 mm in diameter) to the API-5L standard for supplying domestic manufacturers

Value: 40000000

Participation: loan funds, individual investor share

Term: Investment pay-back period 54 months (Development stage)

 

 

The development of steeply dipping deposits in Kazakhstan using underground gasification based on mobile power units

Place: Coal mines between Zhambyl and Almaty regions

Description: The project will solve the problem of underground gasification, minimising underground preparation and operating costs

Value: 12500000

Participation: Equity till 70% if investing 100% of required sum

Term: Investment pay-back period 6 months (Project information is completed and sent to interested companies)

 

Production of heat insulation materials from basalt and mineral super thin fibre (BSTF and MSTF)

Place: Uralsk, West Kazakhstan region

Description: Replenishing capital and circulating assets

Value: 1000000

Participation: loan funds

Term: no information (Development stage)

 

Production of steel stop valves

Place: Uralsk, West Kazakhstan region

Description: organising production of steel stop valves for the oil and gas industry and other uses.

Value: 1500000

Participation: loan funds 1 000 000, own capital 600 000

Term: 10 months (Development stage)

 

Construction of gas-turbine units at the Uralsk Thermal Power Plant

Place: West Kazakhstan region

Description: Replenishing circulating and fixed assets

Value: 13850000

Participation: loan funds

Term: Investment pay-back period 36 months (Project information is completed and sent to interested companies)

 

Production and sale of rubber and general mechanical rubber goods

Place: Kostanai region

Description: Replenishing capital and circulating assets

Value: 99000

Participation: any forms of financing are acceptable

Term: no information (Development stage)

 

 

 

 

 

 

 

 